OK
12
12

Order Summary

3 Services

 1,234

View Cart
MORE
Store Timings
    PAY ONLINE
    CASH ON DELIVERY
    Note: This product is currently not available.
    The product name
    $ 150,000
    If you wish to buy more than one quantity of this product, please add the desired quantity in the next step.
    PROCEED TO PAYMENT
    After clicking the button, you will be redirected to a separate page.
    YOUR DETAILS
    ORDER DETAILS
    this is the product name that is to be bought
    $ 1200
    QTY
    Note: The delivery usually takes 2-5 days depending on availability and your location.
    various kind
    Oh no! Nothing matches ‘’. Try something else?
    Industrial RCC building structural analysis by Staad pro software
    USD  1000
    USD 1000 (Save 0%)
    Not Available | Free Shipping
    We are regularly carrying out industrial building design using staad pro software. These buildings are used in EHV substations and various kind of industrial projects. Our engineers have long experience of delivering optimised civil design of such single / double / multi storied building for housing of electrical panels, switchgears etc. The designs are done as per client's technical specification and international standards like BS/ASCE etc.
    Harmonic Analysis
    USD  2000
    USD 2000 (Save 0%)
    Not Available | Free Shipping
    We do harmonic analysis study for electrical HV and LV systems of various industries. The study is done by ETAP software on the basis of system inputs collected from site and also from drawings.
    ELECTRICAL LAYOUT PLAN & ELEVATION
    INR  0
    INR 0 (Save NaN%)
    Not Available | Free Shipping
    Electrical layout plan and elevation shows location of different electrical equipment in switch yards and control buildings and also in plant electrical rooms. The drawing also shows clearances among various equipment, clearances with walls or building structures, clearances from mechanical equipment in the shop floor and maintenance areas for removal and overhauling of electrical equipment. Building dimensions (LxWxH) are decided on the basis of these drawings. Finalization of these drawings also allow designing of cable trenches, earthing systems, lighting and lightning protection layouts of the substation and electrical buildings. We can offer following type of electrical layout drawings : EHV air insulated switchyard layout plan and elevation. EHV gas insulated substation layout plan and elevation. Electrical layout plan and elevation of Switchyard control building. Electrical layout plan and elevation of Indoor substation buildings. Layout plan and elevation of LT switchgear rooms. Layout plan and elevation of LT MCC rooms in plant buildings. SCADA room Layout. PLCC room layout. Battery room layout. Plant PLC control room layout.
    SINGLE LINE DIAGRAM
    INR  0
    INR 0 (Save NaN%)
    Not Available | Free Shipping
    Single Line Diagram is one of the most important piece of drawing in a Project which describes the Power distribution philosophy, voltage step down or step up, equipment ratings, cable sizes, fault levels at various buses and protective relays provided at various voltage levels. Following type of drawings are generated for various projects : Key SLD for EHV AIS substation projects. Key SLD for EHV GIS substation projects. Key SLD for HV/MV Indoor substation projects. Key SLD of Thermal Power plants. Protection and metering SLD for EHV AIS substation projects. Protection and metering SLD for EHV GIS substation projects. Protection and metering SLD for HV/MV Indoor substation projects. Protection and metering SLD of Alternators. SLD of LV Switchgear panels. SLD of LV ACDB and DCDB panels. SLD of MV/LV MCC panels. Overall SLD of Lighting distribution in Large Plants. SLD of LV Bay Marshalling Kiosks (BMK) for EHV switch yards. SLD of P.F improvement Capacitor panels. SLD of Emergency power supply from DG sets.
    GEOTECHNICAL INVESTIGATION AND SOIL RESISTIVITY TEST
    USD  6000
    USD 6000 (Save 0%)
    Not Available | Free Shipping
    We have the resources, machinery and expertise to carry out soil investigation, soil resistivity tests and CBR tests for substation plots and overhead line routes. We have already provided these services for substation projects of JSEB, SAIL-Bokaro, SBPDCL, Bihar. We have experienced manpower, machinery and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    TOPOGRAPHICAL SURVEY AND LAND PROFILING
    USD  700
    USD 700 (Save 0%)
    Not Available | Free Shipping
    We have executed survey of several substation plots and prepared topographical contour layout plan and elevation drawing of the plot in Autocad. Survey is done by Total station device. We have experienced manpower, machinery and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    33KV OVERHEAD LINE DESIGN
    USD  10000
    USD 10000 (Save 0%)
    Not Available | Free Shipping
    We have the resources and expertise to carry out preliminary route survey, approval of route, detail route survey, soil investigation, soil resistivity test, pole/tower spotting, sag & tension calculations, pole/tower selection, conductor selection, route profile drawing, layout plan and elevation of the overhead line, structural design of different types of poles/towers for overhead lines upto 33kV. We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    EARTHING AND LIGHTNING PROTECTION SYSTEM DESIGN
    USD  7500
    USD 7500 (Save 0%)
    Not Available | Free Shipping
    Earthing of any electrical system is of high importance for safety of working personnel and to obtain system earth for relay tripping. Earthing system is designed as per IEEE-80/BS-7430/IS 3043/IE Rules/CBIP standard as applicable. We do earthing calculations either manually by Excel or by using softwares like ETAP and Cymgrid. Lightning protection system of building and/or outdoor equipment shields them from direct lightning strike. The need for lightning protection system is first established by lightning protection risk assessment study as per IEC 62305 and then the zone of protection is calculated by using IEEE/IEC standards. We do these calculations manually by Excel. We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    ELECTRICAL SYSTEM STUDY BY ETAP SOFTWARE
    USD  25000
    USD 25000 (Save 0%)
    Not Available | Free Shipping
    Electrical system studies by softwares are essential for initial planning for any project. Based on Clients requirements and data collected from site/other disciplines (like mechanical) a software model of the power distribution network can be created in ETAP software to do the following studies : Load flow study for Transformer sizing, Cable voltage drops and sizing, requirement of Capacitors for reactive power compensation. Load flow study also helps in deciding voltage levels at different buses of the substation. 3 phase and earth fault (SLG, LLG) level calculations at different node points of the power distribution system. Motor starting study for voltage drop during starting and normal running of the largest motor in a plant. Protection coordination study for proper relay coordination with upstream breaker. We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    33KV SWITCHYARD DESIGN (AIS/GIS)
    USD  30000
    USD 30000 (Save 0%)
    Not Available | Free Shipping
    We offer the following Design Engineering services for 132kV Switchyard projects : 1. Topographical contour survey 2. Geotechnical investigation 3. Soil resistivity measurement 4. Electrical SLD, protections, metering, controls and indications 5. Survey drawings, Topographical contour layout drawings 6. Overall site layout plan drawings 7. Switchyard layout plan & elevation drawings 8. Indoor and outdoor Cable trench layout drawings 9. Earthing calculation, layout and earthing detail drawings 10. DSLP calculation and layout drawings 11. Control schematics and terminal plan drawings of bay marshalling kiosks 12. Cable schedule and interconnection diagram for Power and control cables 13. Technical specification of all equipment and materials 14. Lighting calculations, SLD and layout drawings 15. Bill of materials for cables, cable trays, racks, earthing, lightning protection and lighting systems 16. Short circuit force calculation for strung bus and rigid tubular bus 17. Fault level calculation 18. CT & VT sizing calculations 19. Battery and battery charger sizing calculations 20. Vendor drawing review 21. Civil drawings and calculations for foundations, cable trenches, culverts, drains, control bldg., DG room, Store shed, Security room, Switchyard panel room (AC Kiosk), pump house, fire water reservoir 22. GS structure drawings for gantry towers, beams and equipment supports 23. SCADA architecture diagram, Input-Output list, BOM of SCADA system 24. Schematic diagrams, Layout drawings, specifications and BOM for Fire detection and alarm system 25. Schematic diagrams, Layout drawings, specifications and BOM for HVAC system We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.