OK
12
12

Order Summary

3 Services

 1,234

View Cart
MORE
Store Timings
    PAY ONLINE
    CASH ON DELIVERY
    Note: This product is currently not available.
    The product name
    $ 150,000
    If you wish to buy more than one quantity of this product, please add the desired quantity in the next step.
    PROCEED TO PAYMENT
    After clicking the button, you will be redirected to a separate page.
    YOUR DETAILS
    ORDER DETAILS
    this is the product name that is to be bought
    $ 1200
    QTY
    Note: The delivery usually takes 2-5 days depending on availability and your location.
    systems
    Oh no! Nothing matches ‘’. Try something else?
    Technical Specification of EHV Substation Equipment and Materials for Substations and Overhead lines
    USD  3000
    USD 3000 (Save 0%)
    Not Available | Free Shipping
    Technical specification of the following EHV equipment and systems shall be prepared : - 400/220/132/33kV kV Circuit Breaker, Isolator, CT, PT, CVT & LA - 11/22/33kV Indoor switchgear - Auto Transformer, Power Transformer - Control & Relay panel - Substation Automation System - LV AC & DC distribution board - DC Battery and Battery Charger - MV, LV Control & Power Cable - Earthing & Lightning protection materials - Lighting fixtures - Steel structures, Clamps, Connectors, Insulators, Conductor, Al tube bus, cable glands, lugs, Hardware - Fiber optic communication system. - Power Line Carrier communication and EPAX
    Technical specification of Fiber Optic based teleprotection system of EHV Substations
    USD  3000
    USD 3000 (Save 0%)
    Not Available | Free Shipping
    We have the expertise of preparing technical specifications and detail design drawings, BOQ and schedules for Fiber optic based tele-protection systems of 400/220/132/33kV Substations in India and abroad. The design shall be carried out as per relevant International standard.
    Relay Setting Calculation & Coordination
    USD  3000
    USD 3000 (Save 0%)
    Not Available | Free Shipping
    We provide Relay Setting Calculations and Coordination charts for over current and earth fault protection of line feeders, transformers, reactors, capacitors in a high voltage substation. The calculations also include setting parameters for distance protection, differential protection, bus bar protection, over voltage and under voltage protections for large electrical HV and LV systems.
    Harmonic Analysis
    USD  2000
    USD 2000 (Save 0%)
    Not Available | Free Shipping
    We do harmonic analysis study for electrical HV and LV systems of various industries. The study is done by ETAP software on the basis of system inputs collected from site and also from drawings.
    ELECTRICAL LAYOUT PLAN & ELEVATION
    INR  0
    INR 0 (Save NaN%)
    Not Available | Free Shipping
    Electrical layout plan and elevation shows location of different electrical equipment in switch yards and control buildings and also in plant electrical rooms. The drawing also shows clearances among various equipment, clearances with walls or building structures, clearances from mechanical equipment in the shop floor and maintenance areas for removal and overhauling of electrical equipment. Building dimensions (LxWxH) are decided on the basis of these drawings. Finalization of these drawings also allow designing of cable trenches, earthing systems, lighting and lightning protection layouts of the substation and electrical buildings. We can offer following type of electrical layout drawings : EHV air insulated switchyard layout plan and elevation. EHV gas insulated substation layout plan and elevation. Electrical layout plan and elevation of Switchyard control building. Electrical layout plan and elevation of Indoor substation buildings. Layout plan and elevation of LT switchgear rooms. Layout plan and elevation of LT MCC rooms in plant buildings. SCADA room Layout. PLCC room layout. Battery room layout. Plant PLC control room layout.
    BID EVALUATION AND TECHNICAL RECOMMENDATION REPORT
    INR  0
    INR 0 (Save NaN%)
    Not Available | Free Shipping
    We evaluate techno-commercial bids of following systems, equipment and material or for EPC turn key bids, We do necessary correspondences with the bidders to take clarifications and bring all of them at same par. After evaluation, a technical evaluation report is sent to Client suggesting whose offers are technically most suitable with respect to the Project requirement. Offers of technically most suitable offers are then opened for price evaluation. EHV/HV/MV/LV Circuit breakers, Isolators, CT, PT, CVT, LA. Switch yard hardware, clamps, connectors, post & disc insulators. Power and distribution transformers. Earthing and lightning protection material. Power cables. Control cables. Fiber optic and instrument cables. LT switchgear and MCC panels. HV/LV motors. Substation automation system. Substation control & relay protection systems. Lighting fixtures and small power sockets. PLC & plant control desks. Erection, testing and commissioning of plant and machinery. Civil works. Steel structural works. Architectural works.
    PREBID ENGINEERING
    INR  0
    INR 0 (Save NaN%)
    Not Available | Free Shipping
    We provide prebid engineering services for electrical, civil, structural, substation automation, HVAC, plant controls & automation systems, equipment and materials for Large industrial projects like EHV T&D substations, Indoor/outdoor industrial substations, EBOP of Thermal power plants, Material handling plants, Steel plants, process industries and misc. industries, factory sheds in India and abroad. We already have standardized formats in computer programs for doing these exercises in short time span. The estimated BOQ can be supplied at a nominal cost and within 7-15 days time. The activity is controlled by senior experienced Consultants and designers. Following input are required to carry out this activity : Scope of work Technical specifications Tender drawings
    33KV SWITCHYARD DESIGN (AIS/GIS)
    USD  30000
    USD 30000 (Save 0%)
    Not Available | Free Shipping
    We offer the following Design Engineering services for 132kV Switchyard projects : 1. Topographical contour survey 2. Geotechnical investigation 3. Soil resistivity measurement 4. Electrical SLD, protections, metering, controls and indications 5. Survey drawings, Topographical contour layout drawings 6. Overall site layout plan drawings 7. Switchyard layout plan & elevation drawings 8. Indoor and outdoor Cable trench layout drawings 9. Earthing calculation, layout and earthing detail drawings 10. DSLP calculation and layout drawings 11. Control schematics and terminal plan drawings of bay marshalling kiosks 12. Cable schedule and interconnection diagram for Power and control cables 13. Technical specification of all equipment and materials 14. Lighting calculations, SLD and layout drawings 15. Bill of materials for cables, cable trays, racks, earthing, lightning protection and lighting systems 16. Short circuit force calculation for strung bus and rigid tubular bus 17. Fault level calculation 18. CT & VT sizing calculations 19. Battery and battery charger sizing calculations 20. Vendor drawing review 21. Civil drawings and calculations for foundations, cable trenches, culverts, drains, control bldg., DG room, Store shed, Security room, Switchyard panel room (AC Kiosk), pump house, fire water reservoir 22. GS structure drawings for gantry towers, beams and equipment supports 23. SCADA architecture diagram, Input-Output list, BOM of SCADA system 24. Schematic diagrams, Layout drawings, specifications and BOM for Fire detection and alarm system 25. Schematic diagrams, Layout drawings, specifications and BOM for HVAC system We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    132KV SUBSTATION DESIGN
    USD  50000
    USD 50000 (Save 0%)
    Not Available | Free Shipping
    We offer the following Design Engineering services for 132kV Switchyard projects : 1. Topographical contour survey 2. Geotechnical investigation 3. Soil resistivity measurement 4. Electrical SLD, protections, metering, controls and indications 5. Survey drawings, Topographical contour layout drawings 6. Overall site layout plan drawings 7. Switchyard layout plan & elevation drawings 8. Indoor and outdoor Cable trench layout drawings 9. Earthing calculation, layout and earthing detail drawings 10. DSLP calculation and layout drawings 11. Control schematics and terminal plan drawings of bay marshalling kiosks 12. Cable schedule and interconnection diagram for Power and control cables 13. Technical specification of all equipment and materials 14. Lighting calculations, SLD and layout drawings 15. Bill of materials for cables, cable trays, racks, earthing, lightning protection and lighting systems 16. Short circuit force calculation for strung bus and rigid tubular bus 17. Fault level calculation 18. CT & VT sizing calculations 19. Battery and battery charger sizing calculations 20. Vendor drawing review 21. Civil drawings and calculations for foundations, cable trenches, culverts, drains, control bldg., DG room, Store shed, Security room, Switchyard panel room (AC Kiosk), pump house, fire water reservoir 22. GS structure drawings for gantry towers, beams and equipment supports 23. SCADA architecture diagram, Input-Output list, BOM of SCADA system 24. Schematic diagrams, Layout drawings, specifications and BOM for Fire detection and alarm system 25. Schematic diagrams, Layout drawings, specifications and BOM for HVAC system We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.
    220KV SUBSTATION DESIGN (AIS/GIS)
    USD  65000
    USD 65000 (Save 0%)
    Not Available | Free Shipping
    We offer the following Design and Engineering services for 220kV Switchyard/GIS substation projects : 1. Topographical contour survey 2. Geotechnical investigation 3. Soil resistivity measurement 4. Electrical SLD, protections, metering, controls and indications 5. Survey drawings, Topographical contour layout drawings 6. Overall site layout plan drawings 7. Switchyard layout plan & elevation drawings 8. Indoor and outdoor Cable trench layout drawings 9. Earthing calculation, layout and earthing details drawings 10. DSLP calculation and layout drawings 11. Control schematics and terminal plan drawings of Bay marshalling kiosks 12. Cable schedule and interconnection diagram for Power and control cables 13. Technical specification of all equipment and materials 14. Lighting calculations, SLD and layout drawings 15. Bill of materials for cables, cable trays, racks, earthing, lightning protection and lighting systems 16. Short circuit force calculation for strung bus and rigid tubular bus 17. Fault level calculation 18. CT & VT sizing calculations 19. Battery and battery charger sizing calculations 20. Vendor drawing review 21. Civil drawings and calculations for foundations, cable trenches, culverts, drains, control bldg., GIS building, DG room, Store shed, Security room, Switchyard panel room (AC Kiosk), pump house, fire water reservoir 22. GS structure drawings for gantry towers, beams and equipment supports 23. SCADA architecture diagram, Input-Output list, BOM of SCADA system 24. Schematic diagrams, specifications, layout drawings and BOM for Fire detection and alarm system 25. Schematic diagrams, specifications, layout drawings and BOM for HVAC system We have experienced manpower and softwares to execute these works. Kindly send us an enquiry to enable us to submit an offer matching with your requirements.